
“The quality and coverage of B2B contact database are very impressive...”
Mark J.
`
Acciona Ferrovial Joint Venture (AFJV) has been awarded the contract to design and construct the Sydney Metro West Central Tunnelling Package. The contract includes the delivery of twin 11 kilometre tunnels and excavation of five station boxes at Sydney Olympic Park, North Strathfield, Burwood North, Five Dock and The Bays. This new underground metro railway will double rail capacity between Parramatta and the Sydney CBD, with a target travel time of about 20 minutes between the two centres. Construction started in September 2021
Afjv operates in the Construction industry.
Afjv's revenue is 11m - 100m
Afjv has 11 - 50 employees.
Get Started with the Free Forever plan! No credit card needed. Enjoy up to 10,000 free email credits per month at no cost.
Start Prospecting from Clodura.AI's database of 600M+ verified B2B contacts and 120M+ direct dials along with 18M+ companies' org charts.
Unlock the prospect's contact details, including verified email, direct dials, add them to cadence, and close more deals.