`

Thermal Power Plant No4

Fossil Fuel Electric Power Generation

revenue-icon Revenue
11M - 100M
funding-icon Total Funding
--
size-icon Size
11 - 50

Frequently Asked Questions About Thermal Power Plant No4

What does Thermal power plant no4 do?+

The foundation of Thermal power plant No.4 was laid in 1979. The first unit was put into operation in 1983 and commissioned the project capacity of 380 MW in 1987. As a result of expansion, the capacity was increased by 160 MW from 1988 to 1990, by each 20 MW in 2007 and 2009, by 120 MW from 2012 to 2014 and current operating capacity is 700 MW of electricity and 1373 GCal of heat generation in total. Thermal power plant No.4 JSC is the largest power plant in Mongolian energy sector which generates over 67.8 percent of electricity for...

What is Thermal power plant no4's industry? +

Thermal power plant no4 operates in the Fossil fuel electric power generation industry.

What is Thermal power plant no4's HQ phone number? +

Thermal power plant no4's HQ phone number is +97670282073

What is Thermal power plant no4's revenue? +

Thermal power plant no4's revenue is 11m - 100m

What is Thermal power plant no4's company size? +

Thermal power plant no4 has 11 - 50 employees.

The Go-to Sales Technology According to G2

G2 Badges Map
Get Started With Clodura
Sign Up

Sign Up for Free

Get Started with the Free Forever plan! No credit card needed. Enjoy up to 10,000 free email credits per month at no cost.

Supercharge Your Prospecting

Supercharge Your Prospecting

Start Prospecting from Clodura.AI's database of 600M+ verified B2B contacts and 120M+ direct dials along with 18M+ companies' org charts.

Grow Your Business

Grow Your Business

Unlock the prospect's contact details, including verified email, direct dials, add them to cadence, and close more deals.